Submit your Email to receive the On Wisconsin Outdoors Newsletter.

Our Sponsors:

Daves Turf and Marine

Williams Lures

Amherst Marine

Cap Connection

Waukesha Truck Accessory store and service, truck bed covers, hitches, latter racks, truck caps

Dick Ellis Blog:
3/25/2024
DICK ELLIS Click here for full PDF Version from the March/April Issue. Seeking Wolf PhotosOWO’s informal census continuesOn Wisconsin Outdoors’ informal wolf census continues. Please send your trail cam photos of wolves in Wisconsin to: wolves@onwisconsinoutdoors.com. List the county where the photos were taken, the date, and verify the number of wolves visible in each photo. Your name will not be published. OWO publishers do not b...
...Read More or Post a Comment Click Here to view all Ellis Blogs

OWO

Waukesha Truck Accessory store and service, truck bed covers, hitches, latter racks, truck caps

Waukesha Truck Accessory store and service, truck bed covers, hitches, latter racks, truck caps

OWO

Waukesha Truck Accessory store and service, truck bed covers, hitches, latter racks, truck caps

OWO

OWO

OWO and Kwik Trip

OWO and Kwik Trip

OWO

OWO and Kwik Trip

OWO

OWO and Kwik Trip

OWO

OWO

OWO and Kwik Trip

OWO and Kwik Trip

OWO and Kwik Trip

OWO and Kwik Trip

Bob's Bear Bait

OWO and Kwik Trip

OWO and Kwik Trip

OWO and Kwik Trip

OWO and Kwik Trip

OWO

OWO and Kwik Trip

OWO

OWO

Miss. River Pool 10 habitat project assessment available for review, comment

The draft feasibility study/environmental assessment for the McGregor Lake Habitat Rehabilitation and Enhancement Project in Pool 10 of the Upper Mississippi River is now available for public information, review and comment.

The U.S. Army Corps of Engineers' document and information.

The project area includes McGregor Lake and the associated island, channel and backwater complex between the main channel and east channel. The entire project area is about 1,063 acres, and lies within the Upper Mississippi River National Wildlife and Fish Refuge adjacent to Prairie du Chien and Marquette, Iowa.

If you have any comments on the environmental assessment, please provide them by Dec. 29, 2018. Any one may request a public hearing in writing by Dec. 14. Both comments and hearing requests should be addressed to the District Engineer, St. Paul District, Corps of Engineers, Attention: Regional Planning and Environment Division North, 180 Fifth Street East, Suite 700 St. Paul, Minnesota 55101-1678.